Home
About Us
TP-Scheme
Development
Projects
Nagarpalika
Photo Gallery
Tender
Contact Us
  language: English | Gujarati
HISTORY OF PLANNING
First town planning act was implemented in 1915.
–This provided for planning of small areas around the city, which is growing or proposed for growth through Town Planning Schemes.
•Act was modified in 1954.
–This Act provided for preparation of development plan (master plan) for the entire city along with detail planning through T.P.Scheme.
•The recent version of the Act is of 1976.
–To day we have provision for covering areas beyond city limit. Act provides for delineating urbaniseable  area and constituting Authority.
Earlier Scenario
  • Chaotic Growth.
  • Inadequate Resources for Infrastructure.
  • Inadequate Land for Roads.
  • Insufficient Data for Planning.
  • Implementation Initiatives Process
    To enable rapid implementation of TP Schemes, AUDA initiated reforms in the Town Planning Act. These reforms were supported by Govt. of Gujarat
  • It makes possible to take possession of land for roads as soon as a Draft TP Scheme is sanctioned.
  • AUDA can recover cost of infrastructure provision in the form of land. This method of cost recovery is now widely accepted by land owners/ citizens.
  • Preparation and Implementation of TP Schemes with usage of new advanced technologies.
    • Total station survey are conducted right at start for upcoming TP Schemes.
    • Computerized preparation of TP Schemes.
    Prahladnagar -a model TP Scheme on previously reserved land in the south-west periphery of the city was taken up first.
    Before
    After
  • The Scheme brings 162 hectares of planned and serviced land into the market which was previously reserved land.
  • Development of infrastructure through self financed and self sustaining mechanisms of TP Schemes from saleable plots allotted to Authority.
  • Roads,Water Supply, Drainage and Street Lighting has been executed.
  • AUDA s Plan & Implementation Status
    From 1978 to 1999 (20 years), 18 Town Planning Schemes (2300 ha.) were implemented.

    From 1999 till date 50 TP Schemes (5028 ha.) has been completed.

    • 39 in west AUDA region (3543 ha.)
    • 11 in east AUDA region (1485 ha.)
     

    47 new TP Schemes (4890 ha.) are under preparation

    • 33 in west AUDA region (3100 ha.)
    • 14 in east AUDA region (1790 ha.)
     
    Aprox. 100 TP Schemes are therefore completed and are in progress.

    CLICK TO ENLARGE
    Impacts of Rapid Implementation of TP Schemes
  • Chaotic Growth.
  • Inadequate Resources for Infrastructure.
  • Inadequate Land for Roads.
  • Insufficient Data for Planning.

  • Pendign PRM File Details
    Impacts of Rapid Implementation of TP Schemes
    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    1
    1
    30.7.81
    19.6.90
    1.1.93
    2
    2
    31.7.81
    22.3.91
    1.1.93
    3
    3
    31.7.81
    8.12.93
    9.12.93
    4
    5
    1.4.90
    3.8.00
    20.9.04
    5
    6
    1.4.90
    14.8.02
    -
    6
    1
    4.2.82
    4.12.86
    1.1.93
    7
    1/A, 1/B
    4.2.82
    14.8.86
    1.1.93
    8
    1
    29.7.81
    13.8.86
    1.1.93
    9
    2
    31.1.78
    19.11.86
    1.1.93
    10
    1
    31.1.78
    5.8.82
    30.5.83
    11
    1
    30.7.81
    9.2.89
    14.12.95
    12
    2
    30.7.81
    1.12.86
    1.1.93
    13
    1
    30.4.82
    10.12.86
    1.1.93
    14
    1
    14.9.76
    31.1.83
    15.2.86
    15
    2
    2.9.76
    16.9.80
    15.2.86
    16
    3
    24.6.77
    14.8.03
    -
    17
    18
    11.10.90
    -
    -
    18
    18
    3.6.96
    24.9.04
    10.11.06
    19
    19
    31.3.99
    27.1.06
    -
    20
    22
    24.5.99
    11.12.03
    10.1.07

    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    21
    20/A 20/B 
    31.3.99
       
    22
    21
    19.12.03
       
    23
    27
    18.2.2000
    27.04.07  
    24
    28
    18.2.2000
       
    25
    29
    27.3.2000
       
    26
    30
    11.6.2000
       
    28
    31
    19.12.03
       
    29
    32
    6.8.03
       
    30
    33
    4.8.04
       
    31
    34
    17.12.03
       
    32
    37
    4.2.2003
    03.09.09  
    33
    38
    4.2.2003
    11.06.09  
    34
    39
    11.12.03
       
    35
    40
    24.5.06
       
    36
    41
    5.2.2003
       
    37
    42
    27.2.2003
       
    38
    43
    27.2.2003
       
    39
    44
    29.8.03
       
    40
    45
    26.8.03
    04.12.08  
    41
    46
    26.8.03
       
    42
    47
    26.8.3
       
    43
    50
    23.6.04
       
    44
    51
    2.1.04
       
    45
    52
    2.1.04
       
    46
    54
    27.4.07
       
    47
    56
    12.1.07
       
    48
    60
    6.4.05
       
    49
    63
    4.3.06
       
    50
    64
    11.7.05
       
    51
    70
    04.09.06
       
    52
    71
    21.09.06
       
    53
    72
    21.09.06
       

    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    53
    74
    (04.09.06) Sanction
       
    54
    75
    Submitted (24.12.06)
       
    55
    80
    Submitted (2.7.07)
       
    56
    84A
    3.8.06
       
    57
    85
    17.2.06
       
    58
    94
    4.9.06
       
    59
    101
    9.10.03
    9.3.06
    07.07.08
    60
    102
    11.2.03
       
    61
    103
    11.2.03
       
    62
    104
    11.2.03
       
    63
    105
    9.10.03
       
    64
    106
    26.8.03
       
    65
    109
    16.12.03
       
    66
    111
    16.12.03
       
    67
    112
    10.12.03
       
    68
    113
    15.12.03
       
    69
    114
    15.12.03
       
    70
    116
    15.12.06
       

    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    67
    212
    30.6.06
       
    68
    213
    30.8.06
       
    69
    214
    30.6.06
       
    70
    215
    30.6.06
       
    71
    216
    6.4.06
       
    72
    238
    Submitted (3.4.07)
       
    73
    239
    Submitted (2.7.07)
       
    74
    301
    15.12.06
       
    75
    4
    11.4.90
       
    76
    23
    18.2.2000
       
    77
    24
    18.2.2000
       
    78
    25
    27.3.2000
       

    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    79
    26
    6.11.2000
       
    80
    107
    20.08.09
       
    81
    110
    15.01.08
       
    82
    53A
    5.6.08 Submitted
       
    83
    221
    24.6.08 Submitted
       
    84
    128
    8.8.08 Submitted
       
    85
    115
    10.10.07 Submitted
       
    86
    73
    26.12.07 Submitted
       
    87
    204
    02.07.09 Submitted
       
    88
    217
    19.03.09 Submitted
       
    89
    228
    19.03.09 Submitted
       
    90
    241
    10/9/2012
       

    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    91
    53B
    20.03.09
       
    92
    73
    04.09.06 Sanction
       
    93
    81
    19/12/2011
       
    94
    107
    31.08.07
    20.08.09
     
    95
    119
    22.01.09
       
    96
    121
    19.12.08
       
    97
    125
    22.01.09
       
    98
    1
    10/9/2012
       
    99
    2
    3/10/2011
       
    100
    3
    12/7/2010
       
    101
    236
    19.11.2011
       

    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    102
    18/09/2012
       
    103
    29/10/2013
       
    104
    20/11/13
       
    105
    2/12/2013
     
    106
    29/10/2013
       
    107
    29/10/2013
       
    108
    20/11/2013
       
    109
    17/12/13
       
    110
       
    111
       
    112
       

    Sr. No.
    T.P.S. No
    Area/Village
    Date of Sanction of Draft T.P. Scheme
    Date of Sanction of Priliminary Scheme
    Date of sanction of Final Scheme
    1
    2
    3
    4
    5
    6
    113
    20/11/2013
       
    114
    26/8/2013
    115
    30/7/2013
    116
    15/07/2014
    117
    30/7/2013
    118
    119
    120
    10/2/2014
       
    121
    2/12/2013
    122
    26/8/2013
    112
       

    More Then 100 TP Scheme means Land & Infrastructure Provision for more then 15 Lacks People
      Copyright ©2008, auda.org.in, All Rights Reserved