Engineering

Road Network

DEVELOPMENT OF RING ROAD
  • Development of a 60m wide, 76 km long city level Ring Road estimated cost of Rs.335crores
  • Usually, the land acquisition process is used to acquire land for provision of infrastructure
  • The land falling in urbanized zone, of 59 K.m. length, is procured through TP Scheme.
  • Length of 17 k.m. falling in non urbanized area is acquired by land acquisition.
  • Two lane road is operational and one BOT base construction of two lane is started and it is likely to be completed by June ‘08
Four links of the Ring Road

Link 1: Rajkot Highway Junction (NH-8A) to Vadodara Highway Junction (NH-8) of 14.106 kms

Link 2: Vadodara Highway Junction (NH-8) to Himatnagar Highway junction (NH-8) of 25.518 km

Link 3: Gandhinagar Highway Junction (NH-8C) to Rajkot Highway Junction (NH-8A) of 22.862 km

Link 4: Himatnagar Highway junction (NH-8) to Gandhinagar Highway Junction (NH-8C) of 13.827 km

Over Bridges


Pt. Dindayal Upadhyay railway over bridge, Chandlodiya.

Shyama Prasad Mukharji railway over bridge, Vejalpur

Under Pass

Construction of under pass below railway line near Nirnaynagar @ the cost of Rs. 6. 00 Crores approx.

Flyover Bridges

Construction of 4 lane ROB/Flyover bridge on Chankaypuri Railway crossing @ the cost of Rs. 14.00 Crores approx.

THREE SPLIT FLYOVER BRIDGES IN AUDA AREA
  1. Flyover at Memnagar Junction on 132’ Ring Road
  2. Flyover at Shivranjani Junction on 132’Ring Road
  3. Flyover at Sola Junction on 132’ Ring Road.